Home/Built to Code

Designed to pass the inspections that matter.

Engineered to align with the U.S. codes that permits depend on, so a plan reviewer sees a system, not a science project.

Built to U.S. code

Designed to pass the inspections that matter.

GOGER panels are engineered to align with the U.S. codes that permits depend on, so a plan reviewer sees a system, not a science project.

GOGER wall panel cutaway, concrete, insulation, and finish
1Structural concrete face2Continuous insulation core3Finished interior layer
ASTM E119 / E84 Fire resistance Non-combustible assembly
HUD Code · IRC · IBC Residential & commercial Engineered to align
IECC · Title 24 Energy / insulation Continuous insulation, high R-value
Florida HVHZ · Miami-Dade Wind & impact High-velocity zone target
WUI Chapter 7A (CA) Wildfire Ignition-resistant face
ASCE 7 · Seismic Structural loads Reinforced & engineered

Certification status in final verification, verified certificate numbers and test labs available to qualified builders on request.

GOGER precast concrete panels being cast in controlled factory moulds

Certified & verified

The paperwork a plan reviewer wants to see.

Engineered to the U.S. frameworks builders permit against every day, with documentation available for qualified projects.

ASTM E119 / E84HUD CodeIRC / IBCIECC · Title 24Florida HVHZWUI Chapter 7AASCE 7 Seismic
  • Engineered, stamped documentation for qualified projects
  • Energy compliance through continuous insulation and high R-value
  • Factory QA on every panel, traceable batch to batch